|
|
Buffalo Sewer Authority
»
|
|
|
click on an image to view a larger image |
|
|
Quackenbush was selected to perform a challenging absorption chiller change out at the Bird Island Treatment Plant, Mega-Structure Building.
This required an extremely intricate vertical and horizontal rigging plan - moving the old chiller out and the new one set in place through a small opening in the second floor. We worked in conjunction with the chiller manufacturer to design a special rigging cradle to assist in the dual directional movement needed.
Chilled and condenser water piping was removed and replaced connecting to existing service lines .
The project was completed safely and on time. |
|