FMC Corporation
»
|
|
|
click on an image to view a larger image |
|
|
Quackenbush was chosen to perform the process mechanical work to upgrade an existing treatment / storage facility for FMC.
Work was partially performed during the COVID-19 crisis and consequentially there were numerous schedule and trade coordination issues. To help accommodate this we extensively used our 3D laser scanning technology to be able to verify existing site conditions / dimensions enabling us to prefabricate close to 90% of the piping assemblies at our 40,000 sq ft fabrication facility.
The ground and storm water piping connected to two existing and three new epoxy lined 600,000 galloon storage tanks. Varying hydraulic profiles and critical thru wall pipe penetrations made the scanning imperative.
The project was safely done, within the COVID-19 adjusted completion schedule. |
|